Bolt and Forge was contracted to review and upgrade this project as part of a large portfolio of underperforming projects that were acquired by their client. The work involved review of the existing system designs, creating revised standardized As-Built Drawings, inspections, fault finding and system upgrade recommendations.
Once systems upgrades and repairs were made, Bolt and Forge monitored and reported on these projects for a period of 1 year, at which time the portfolio was sold to a Solar Operations company.
Equipment & Rough Quantities
420 kWAC & 533 kWDC
2,184 x Solar Modules
2,184 x Fixed Tilt Racking Tables
21 x String Inverters
1 x LV Panelboard
Products Offered
As-Built Drawing Packages
As-Built Energy Production Estimates
Performance Testing and Evaluation
PowerTrack Project Implementation
Drone Surveys, Videos and Images