Winslow School #3 Solar Rooftop


Involvement

Bolt and Forge was contracted to review and upgrade this project as part of a large portfolio of underperforming projects that were acquired by their client. The work involved review of the existing system designs, creating revised standardized As-Built Drawings, inspections, fault finding and system upgrade recommendations.

Once systems upgrades and repairs were made, Bolt and Forge monitored and reported on these projects for a period of 1 year, at which time the portfolio was sold to a Solar Operations company.

 Equipment & Rough Quantities

  • 235 kWAC & 277 kWDC

  • 1,134 x Solar Modules

  • 1,134 x Ballasted Rooftop Racking

  • 12 x Combiner Boxes

  • 3 x Central Inverters

  • 1 x LV Panelboard

Products Offered

  • As-Built Drawing Packages

  • As-Built Energy Production Estimates

  • Performance Testing and Evaluation

  • PowerTrack Project Implementation

  • Drone Surveys, Videos and Images

  • System Review - Punch-listing